Anhui's first fully automatic subway, the first phase of Hefei Line 8 starts no-load trial operation
Article Introduction:According to news from this site on September 1, this morning, the first phase of Hefei Rail Transit Line 8 officially launched no-load trial operation and is expected to open for initial operation by the end of the year. ▲Image source Hefei Rail Transit Public Account This site learned that the first phase of Line 8, as the first fully automatic subway in Anhui Province, can automatically realize train automatic wake-up, sleep, start, acceleration, and braking under the unified control of the control center. , parking, door switch and other functions. The first phase of Line 8 is 22.5 kilometers long, all are underground lines, and transfers with the existing Line 3 Yilijing Station. It has Yilijing, Xinglin, Luyang Economic Development Zone, No. 6 Middle School Linghu Campus, and Hetang Road. , Shuangfeng, Jinmei Road, Meichong Lake, Beicheng Century City, Shuangdun, Provincial Hospital North District, and Beicheng High-speed Railway Station, a total of 12 stations. According to relevant national regulations, the trial operation time shall be no less than 3 months.
2024-09-02
comment 0
1125