Home>Article>Development Tools> The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

咔咔
咔咔 Original
2021-04-12 11:36:28 14198browse

Related articles:
1. "Permanently activated your artifact (phpstorm)"
2. "Goland permanent activation"

Explain that this method is applicable to all IDEs, whether it is goland or phpstorm

I don’t know how stupid these two are. All activations through plug-ins are invalid, and in most cases they have been officially harmonized. There are countermeasures at the top and policies at the bottom! There are currently two ways to activate, one is to activate by modifying the host file, and the other is permanent activation in disguise of an unlimited 30-day trial.

In fact, it is permanent. Someone is making holes and someone is fixing the loopholes. It can be used as long as it lasts and it becomes ineffective before activating it! How much time can be used.

Kaka does not recommend modifying the host file as an activation method. There will be many problems when trying the host activation method. If you want to use it, just find a way!

Download plug-in: https://www.yuque.com/u30882/rx39g7/dhe52q

Then throw this plug-in directly into the workspace, and the interface will look like the picture below

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

Then such a logo will appear in the lower right corner

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

Click Eval Reset in the lower right corner and the following interface will appear. Mark the circled area with √

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

and then click the Reset button

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

The following interface will appear, prompting that the IDE will restart and asking to confirm the recovery settings

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

#Click OK, and then the IDE will restart and you can have fun playing.

Today is 4/12, and the activation will be on 5/12. Check whether the activation is completed. You will see that the activation time will be extended by one day tomorrow. All operations are invisible. Yes, you don’t have to do it every time.

So as to achieve the effect of unlimited use.

The activation codes have expired in the past two days! (Applicable to both phpstorm and goland)

Persistence in learning, persistence in writing, and persistence in sharing are the beliefs that Kaka has always adhered to since its beginning. I hope that Kaka’s articles on the huge Internet can bring you a little bit of help. I’m Kaka, see you next time.

The above is the detailed content of The activation codes have expired in the past two days! (Applicable to both phpstorm and goland). For more information, please follow other related articles on the PHP Chinese website!

Statement:
The content of this article is voluntarily contributed by netizens, and the copyright belongs to the original author. This site does not assume corresponding legal responsibility. If you find any content suspected of plagiarism or infringement, please contact admin@php.cn